This page is dedicated to remembering the tasks involved, the work entailed, the committment put
forth in the erection of our teams practice building during the summer of 2002. The first practice in our new building was held in October of 2002. For 10 years we had hauled matts for every practice for the team, (for seven years, we drove from Olin, thats 36 miles plus one way, but not anymore)! Here is the story, complete with pics, to preserve a little bit of our history. You might find it an interesting read. I also had a hand in almost everything that was done, from start to finish.
But, I didn't do it all myself. Here is a list of people, and there tasks
they took on. Summer of 2002-The beginning-
The start of the project was with an old 30' x 80' hog finishing building.
It had old styrofoam insulation sheets in the ceiling, hydrants in the floor,
and old wiring throughout. Some side wood was rotton, and over 1/3 of the roof was gone.
The First job was the Metal roofing was repaired and the Old building was opened up.
Trying to locate a pic of that.
Preparation-before the start- An Alternate title- "The Mess"
Preparation-we've only just begun!
It took a number of days to get it all cleaned up.
Hey the bags were on sale, What can I say. :) Index The birth of the teams new buildingSome additional prepping....I must first tell about the cement work that was done before the shell was erected. Pouring of cement; It was determined, because, of the nearness of Hwy 13, the old ceiling interior height, that it would be easier for the cement truck to manuver around the posts before the framework was up, for the cement. Hydrants, old rusty pipes, electric lines in pipes(coming out of the floor) and water drinkers lines were removed. Along with a few (9) wood posts, that were cemented in the floor for pens. The old floor portion had a slope on the floor,(for manure runnoff), and we had to make that leval. There was 8 inches required of cement on one side, and it was sloped to give enough fill on the other side, without being thin. We had to remove a portion of the old cement pad on the south east side where a frame corner post had to go, on the new addition. This just happen to be at the old foundation edge of the outside runs, that was approximatly 3 plus feet deep. And add a snafoo of a water line on the south side that had to be removed for good measure, before the cement was poured in the new section was poured. Index Addition added-we've only just begun!New addition 40x40, with the old sectionThe new addition is up and up is from floor to peak about 22.5 feet (the coupala adds another 7 feet to that). On the south end side, it sticks out(overhangs) about 5 feet and peaked. Imagine hanging out putting shingles on it. I was there. Putting the rafters on, is a story in itself. Delivered to the site when nobody was there, they were kinda put out of the way. Like 350 feet.... When Coonrod came with the crane, we had gotton them all moved, and stacked real nice by the building, on the south side. My ole rusty Toyota pickup came in handy for that job. I connected out riggers on my truck and rested the rafters on em. I Screwed a 2x4 on the front bumper and used sissor clamps and a 2x4 on the back bumper. So one by one, we moved 21 tall rafters in like 40 minutes, with 4 people. 2 were on each end, and one was in the bed of the pickup, holding it from floping, and I was the driver. Everybody thought my idea was the greatest, cause no one knew how we could possible move these huge rafters, to where they needed to go without problems. Rafters were like 40x12...and not very stable. The south wall of the old building, where the new addition attached, was removed. A beam was installed, that spanned the full lenght, to take the roof load, and to join the two buildings as one. The beam was like 30'L x 15"H x3" thick and laminated. You can see one of them we used in the pic above. Index Siding was installedto protect the frame from the elements. Small note# the two garage doors were added at this time- No pics Siding starting to be added;Looking south
Index Painting-we've only just begun!We did painting the Old fashion way. With a paint brush.
Primed 1 coat oil base, and Painted again with color.